-
Home
-
Case Study Supply Chain Optimisation
Lead time and costs reduced
Customer brief: "My warehouse is full, you need to come up with something!". The result today:
- Time and cost savings through just-in-time delivery of the packaging materials to the packaging line
- Reduction of lead times in production by approx. 65%
- Reduction of expenses by around 400,000 euros
- Sustainable production through savings of several tonnes of set-up material
You can download the complete case study here: